Skip to content

South Coast Greenway Trail - 19th Av SE Traditional Geocache

This cache has been archived.

TheWeatherWarrior: Nope, time to do other, higher quality caches.

More
Hidden : 9/21/2013
Difficulty:
1.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

Trail is not actually ready yet. But approval and agreements are all made. They just need to build it. This is the first cache placed for the trail.


The South Coast Greenway (trail) was conceived of back in the 1990s, or earlier. It is meant to connect some of the various existing parks and preserves with each other so that folks can hike/bike between them. Additionally, this portion is also meant so that school kids and others can walk from the high school and community college to neighboring areas. It was even disccussed that the path would be good for exposing children to the nature areas.

Both TECO and Hawks Point (part of the trail is on their properties) have already agreed to the trail. It is a done deal. It just needs to be built.

This cache is located on the right-of-way of the road. At the moment, you can't easily walk the proposed path. While there is the easement for such and it is not illegal, I would wait for a little more work on the path to be done.

*Not on private or restricted property, please respect boundaries/property limits*

UPDATES & REFERENCES:

Here is a link to a July 2013 article about the trail:

http://tbo.com/news/politics/south-coast-greenway-trail-may-be-back-on-track-20130728/

Della Cury, Legislative Aide to Sandra L. Murman updated the status to a fellow geocacher who forwarded me the message. Currently the trail is under design phase and should be completed in a year's time (late summer 2014). Construction (if funded) will begun after that. This is for Phase I only (College Av. to 19th). This is from Richard Sanders, the Manager for the Southcoast Greenways Trail. Contact me if a contact number is desired.

Additional Hints (Decrypt)

Cvax gbc, ba gur tebhaq. Funql

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)