Skip to content

Power Grid. Traditional Cache

Hidden : 8/26/2009
Difficulty:
2 out of 5
Terrain:
2 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

This cache is on the access road down to Murray river and the Redcliffs bout ramp. 2WD access most of the time. There are several move caches along the stretch of river. This cache is overlooking the Redcliffs power transition station

Murraylink is an Australian high voltage direct current electricity transmission link between Berri in South Australia and Red Cliffs in Victoria. This is believed to be the world’s longest underground transmission system. The Murraylink consists of two 180-kilometre long bipolar HVDC cables, which for environmental protection reasons are underground, with an operating voltage of 150 kV and a transmission capacity of 220 megawatts.

Additional Hints (Decrypt)

Ba gbc bs gur yril onpx.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)