78 MCT Renewed
There is an exit from the river after about 400m on the north bank, a small muddy "beach". It is then a few hundred metres to the main Lockmeadow car park. A preferred take-out point can be found by continuing just round the corner until you come to a concrete wall on the left bank. This is close to the smaller part of Lockmeadow Car Park.
🏞 The series
This series honours the original MCT – or Medway Canoe Trail – set by heartstones1. With 31km of trail, there are lots of options about where to start and finish. All the information you need to plan is on 01 MCT Renewed.
🦺 Safety and practical information
Please wear a buoyancy aid on the water, however strong a swimmer you are. All other practical and safety information about river conditions and considerations can be found on 01 MCT Renewed.
🌊 Access points, from west to east, heading downstream
It is suggested to split the series into shorter sections. There are lots of options for how to chunk it. Information about parking, train stations and put in points can be found on 01 MCT Renewed.
This cache has been placed for the South East UK Mega 2024 (GCAAB24)