Skip to content

Snoqualmie Hydropower Traditional Cache

This cache has been archived.

Forty-n-Eight: The lower falls are undergoing a 3-year renovation and won't open again until early 2013. An associate of mine with connections will retrieve the cache. Thanks to all who visited!

More
Hidden : 10/7/2006
Difficulty:
2 out of 5
Terrain:
1.5 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

The cache is located near the end of Fish Hatchery Road on the way to the PSE hydroelectric plant at Snoqualmie Falls. There is parking nearby from dawn to dusk. While you're here, continue on past the hydro plant for an easy walk to the bottom of Snoqualmie Falls.

You are looking for a small lock-n-lock just feet off the trail on the side of the road; no need to go tramping down the hill. This can be a busy area, so please be careful in your search.

About Snoqualmie Falls Hydro Project from www.pse.com
Snoqualmie Falls Hydroelectric Project No. 2493 (Snoqualmie Project) is located on the Snoqualmie River, in Snoqualmie, Washington. The Snoqualmie Project consists of a diversion dam located 150 feet upstream from Snoqualmie Falls, and two powerhouses (Plants 1 and 2) with a total installed capacity of 44.4 MW. Snoqualmie Plant 1 was originally constructed in 1898 and contains the world's first completely underground powerhouse, built in a cavity 270 feet below Snoqualmie Falls. Snoqualmie Plant 2, about ¼ a mile downstream from Plant 1, was built in 1910 and expanded in 1957.

Congrats to roosternchics for FTF!

Additional Hints (Decrypt)

Haqre sreaf naq ebbgf.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)