Skip to content

Olympia Odos: Isthmus of Corinth Traditional Geocache

This cache has been archived.

Greatland Reviewer: Γειά σας.

Αυτή η ιστοσελίδα έχει αρχειοθετηθεί λόγω έλλειψης αντίδρασης, μετά από μυνήματα που στάλθηκαν σχετικά με προβλήματα στην κρύπτη. Αν επιθυμεί ο ιδιοκτήτης, την επαναενεργοποίηση της, μπορεί να έλθει σε επαφή μαζι μου μέσω του profile μου, το συντομότερο δυνατό ,πριν μια νέα κρύπτη τοποθετηθεί στην περιοχή της.

Σημειώστε οτι η επαναενεργοποίηση μιάς κρύπτης απαιτεί την ίδια διαδικασία με τον έλεγχο νέας κρύπτης και θα ισχύουν οι τρέχοντες κανόνες.

Με εκτίμηση,

Greatland Reviewer
Εθελοντής της Groundspeak
My Profile: http://www.geocaching.com/profile/?guid=6354843d-6bec-4737-8db5-77907f57de8a

Hello:

This cache page has been archived due to the lack of response to one or more prior Reviewer Note(s) about issue(s) with the cache. If the owner would like to have the cache unarchived, please contact me through my profile as soon as possible before another cache gets placed nearby.

Please note that unarchiving a cache page requires the same review process as a new cache, using the cache placement guidelines currently in effect.

Regards,
Greatland Reviewer
Groundspeak Volunteer
My Profile: http://www.geocaching.com/profile/?guid=6354843d-6bec-4737-8db5-77907f57de8a

More
Hidden : 5/4/2017
Difficulty:
4 out of 5
Terrain:
2.5 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


Caches along the Olympia Odos  Motorway 8   Elefsina - Korinthos 

Olympia Odos, (the road axis linking Elefsina - Korinthos - Patras - Pyrgos - Tsakona) constitutes the largest PPP motorway project of Greece. The project represents a new, modern and comfortable highway, with a total length of 365.4 km, through which a more direct and safe connection between Elefsina and Tsakona of Messinia region, will be created. The project will contribute towards the improvement of the overall mobility at the south western part of Greece, by significantly decreasing the travel time and by facilitating through an easier way, business activities and co operations at the regions of Peloponnese and Western Greece. Out of the 365.4 km of the project, 283.7 km are being constructed from the beginning, while the rest 81.7 km are being improved and upgraded. The Group through AKTOR CONCESSIONS SA is participating to Olympia Odos with the percentage of 17% and AKTOR is participating to the construction of the overall project with the percentage of 17%. 

Additional Hints (Decrypt)

ΚΟΙΤΑ ΤΡΙTΥΡB

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)