Skip to content

I90/94 eastbound wisconsin river rest area Traditional Cache

This cache has been archived.

bugsmasher69: The construction got it. So long it was a great run.

More
Hidden : 4/19/2007
Difficulty:
1.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

Located in the rest area near wisconsin river on the east bound side. Hopefully we can keep this one up and going thru the whole construction project BUT PLEASE BEWARE OF CONSTRUCTION VEHICLES, CARS AND TRUCKS while looking for this cache. You are looking for a small pill bottle. Should be a quick find while taking a break from your travels.

This rest area and the one across the highway are going thru a nearly $22 million renovations - paid for with 90 percent federal funds and 10 percent state money - will result in a larger building, a more spacious parking lot and a vast increase in the number of restroom fixtures at rest areas No. 11 (eastbound) and 12 (westbound), located just south of Portage. "These will be the largest rest areas we've ever built in Wisconsin and they're going to remain open most of the time during the two years they'll be under construction," he said. The project started earlier this month, and the scheduled completion date is late October or early November 2010. Some of the changes planned include: • Tearing down the existing buildings and replacing them with Frank Lloyd Wright style-structures that will include interior lobby with bench seating, new racks for travel information brochures and a tall clock featuring a cutout in the shape of Wisconsin. The existing buildings are about 1,700 square feet, Simon said. The new ones will be about 9,000 square feet. • Additional parking spaces, especially for trucks. The size of the truck lots will increase from about 25 spaces apiece to about 68. • Nearly double the number of toilet fixtures in both the men's and women's restrooms. "In the summer, we have long lines for the bathrooms," sometimes resulting in a need to bring in portable toilets - a need that the new construction is intended to alleviate, Simon said. • The addition of a "family assisted" restroom, mainly for situations such as older couples accustomed to assisting each other in the restroom, or mothers of little boys who don't feel comfortable either sending their sons to the men's room alone or bringing them into the women's room. There also will be diaper changing stations in both the men's and women's restrooms. All this is needed, Simon said, because the two rest areas are, by far, the busiest in Wisconsin, largely because they're located in an area where three different interstate highways converge. Out of every 100 vehicles that drives past either rest area, between eight and 12 will stop, he said. Those that stop during the construction will rarely be turned away, according to Yahnke. Plans call for no more than nine total days when either the parking lots or buildings will be closed. To make that happen, Simon said, the work will be done in phases. The first thing to be built at each rest area will be the new truck lot, to be completed sometime in early 2009. When that's done, trucks and cars will be routed to the new truck lots so the car lots can be rebuilt - meaning some users will have a longer-than-usual walk from the parking area to the building. Temporary concrete barriers will be set up to ensure the safety of pedestrians during the time when the truck and car lots are combined, Simon said. When the new buildings are completed, they will be opened and the old ones torn down. Simon said there might be a few days during the construction when neither structure is open, to allow for the transition. Simon said several features of the new buildings are designed for energy efficiency. For example, the two buildings will have identical designs, but both will have the side with the most windows facing southwest to capture more natural heat and light for the lobby. For that reason, the structures will look different from the road, depending on which direction a traveler is going, Simon said. To further differentiate the buildings on opposite sides of the interstate, they'll have different color roofs - one burgundy, one green.

Additional Hints (No hints available.)