Skip to content

Micro Generation Traditional Cache

This cache has been archived.

The Defective Detectives: Retired

More
Hidden : 3/2/2008
Difficulty:
1 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

There is little parking opportunity at the site but there is plenty in the lay by on the A394 less than 0.5 miles away – please be careful crossing this sometimes busy road.

Due to the proximity to the farm opposite, please use stealth in recovering this cache.

This micro cache is situated near to Cornwall’s newest Wind Farm. The renewable energy department from Camborne School of Mines is carrying out a series of research projects on the wind cluster and installed sensors during the construction of the turbines so they can monitor the mechanical properties of the structures. They are also being given access to the data system, which gives information on the amount of energy being produced. These 2 turbines are predicted to produce 5,500 Megawatt hours of clean electricity a year, equivalent to the annual electricity use of 1,100 Cornish households. The electricity will go into Western Power's network via underground cabling. Allowing six months to repay the carbon debt involved in manufacturing the two turbines, the project will produce carbon-free electricity for the rest of its working life, expected to be at least 20 years. Not only that but (controversially!) we think they’re beautiful.

Nearby is one of over 1500 Royal Observer Corps Bunkers, used as a monitoring room during the Cold War. More information can be found at (visit link) (Thanks to The Defender for the info.)

Additional Hints (Decrypt)

Zvaq gur fgrc!

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)