Another Bridge To Nowhere Traditional Cache
Another Bridge To Nowhere
-
Difficulty:
-
-
Terrain:
-
Size:
 (micro)
Please note Use of geocaching.com services is subject to the terms and conditions
in our disclaimer.
This cache is a black bison tube. The cache should be avaiable year around and is NOT handicap avaiable.
The bridge services the local farmers and ranchs in the area. The bridge was built in the summer of 2009 for around $800,000 plus or minus. The contractors name wasTCI from Bozeman. Over 60 % of the materials to constructed the entire project was purchased locally; cement, gravel, riprap, seeding material and lumber used for forming the bridge itself. The crew stayed locally, supporting eaterys and lodging; a nice little boast for the local economy.
Additional Hints
(Decrypt)
Fvkgu fvatyr cbfg.
Treasures
You'll collect a digital Treasure from one of these collections when you find and log this geocache:

Loading Treasures