Skip to content

Market Weighton Canal - Weighton Lock Traditional Cache

This cache has been archived.

Dalesman: This cache has been in need of care and maintenance for some time and as the owner has not responded to recent logs or logged into geocaching.com for some time I am archiving it.

Guidelines:[i] "You are responsible for occasional visits to your cache to maintain proper working order, especially when someone reports a problem with the cache (missing, damaged, wet, etc.). You may temporarily disable your cache to let others know not to search for it until you have a chance to fix the problem. This feature is to allow you a reasonable amount of time - normally a few weeks - in which to check on your cache. If a cache is not being maintained, or has been temporarily disabled for an unreasonable length of time, we may archive the listing."[/i]

If you wish to email me please send your email via my profile (click on my name) and quote the cache name and number.

Many thanks,
DalesmanX

Volunteer UK Reviewer - geocaching.com
UK Geocaching Information & Resources http://www.follow-the-arrow.co.uk
Geocaching Help Centre http://support.groundspeak.com/index.php
United Kingdom Geocaching Wiki https://wiki.groundspeak.com/display/GEO/United+Kingdom

More
Hidden : 5/10/2010
Difficulty:
1 out of 5
Terrain:
1.5 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

A click and lock box located near to the Weighton Lock which affords access from the River Humber to the Market Weighton Canal .
The cache is on a public footpath which runs alongside the canal

The Market Weighton Canal ran 9.5 miles from the Humber estuary to its terminus near Market Weighton. It gained its Act of Parliament in 1772 and opened in 1782. The 3.5 miles closest to Market Weighton was abandoned in 1900 and the right of navigation through Weighton lock was lost in 1971. However as of 2002 the lock was passable and the canal usable up to the junction with the River Foulness where silt has made it impassable.

History
The canal was conceived as part of a wider scheme to drain the low lying land and fens between the River Humber and Market Weighton. Some 50,000 acres (20,000 ha) of land were threatened by flooding, both from rain and from water flowing into the area from a larger catchment covering 80,000 acres (32,000 ha), including the East Yorkshire wolds, which border the area to the east. Prior to the scheme, most of the lower area was marshland, while the upper area suffered from waterlogging, and was only suitable for grazing of animals.
The scheme was authorised by an Act of Parliament of 21 May 1772, entitled, "An Act for draining and preserving certain Commons, Low Grounds, and Carrs, in the parish of Market Weighton, and other adjacent parishes in the East Riding of the County of York; and for making a navigable Cut or Canal, from Market Weighton to the River Humber." The Act did not include powers to raise capital, as a group of people had agreed to finance the initial construction, while ongoing revenue was to be provided by a tax on landowners who benefitted from the drainage and by the enclosing of common land, in addition to the normal tolls. The engineer appointed to oversee the work was a Mr. Whitworth, and was managed by a committee of Drainage Commissioners.
The canal was completed by 1782, and the main traffic consisted on agricultural produce and bricks, including Walling Fen bricks, which were fine, white and durable. Because of the dual purpose of drainage and navigation, water levels in relation to the land surface were strictly controlled by the terms of the enabling Act. There was inevitable conflict between the two functions, with the navigation requiring higher water levels than the drainage functions required. A number of brickworks were established along the canal in the Newport area, and it was a commercial success. Decline
As with many others, the arrival of railways in the area started the decline of the canal. The York to Market Weighton line opened in 1847, and the subsequent loss of income resulted in the condition of the canal deteriorating, to the extent that the Commissioners sought an act of parliament in 1900 to abandon the canal as a navigation, and although the section above Sod House lock was abandoned in that year, the commercial carrying of bricks continued until the 1950s. This traffic was carried in Humber sloops. The condition of the canal continued to deteriorate until the formation of the Market Weighton Drainage Board in 1934, an Internal Drainage Board under the terms of the Land Drainage Act of 1930. They took over the powers of the original Drainage Commissioners, and are responsible for 113 miles (182 km) of arterial watercourses, most of which drain into the canal or the River Foulness, both of which came under the jurisdiction of the now defunct Yorkshire Rivers Authority in 1951.
The lower section of the canal, including Weighton Lock, (also called Humber lock), which provides access to the River Humber, was abandoned in 1971, but when they heard that the lock was likely to be demolished, the Market Weighton Civic Trust moved quickly to have the whole structure listed as an ancient monument and their action, together with public pressure resulted in the lock being repaired and reopened. Further repairs and an overhaul of the structure were carried out in 1994 by the National Rivers Authority at a cost of £1.5 million, and although there is no public right of navigation on the waterway, access is possible by arrangement with the Environment Agency, who currently own it.
Drainage
During the 1960s, the area was affected by flooding, as a result of heavy rainfall, and the decision was taken to convert the River Foulness and the canal into a highland carrier drain. This involved raising the level of the banks, making the main channel wider and deeper, and creating storage areas for floodwater on both sides of the canal at Broomfleet. This work was undertaken by the Rivers Authority. The Drainage Board were responsible for constructing six pumping stations between 1975 and 1979. Improvements to the drainage channels brought the cost up to £839,000, although 70% of this was provided by grants. In the 1980s, a £1 million scheme resulted in further improvements to the drainage works, and two more pumping stations were built, at Crabley and Skelfleet Cloughs.
As a result of the conversion of the Weighton Lock sluices to electro-mechanical operation in 1971, it was possible to raise water levels in the canal without adversely affecting the drainage functions. Around 80% of the water entering the catchment leaves it via the Weighton Lock sluice. Water in the north west of the catchment flows into the River Foulness and the canal by gravity, whereas water in the south east is managed by pumping stations, which pump into the canal. Two of the nine pumping stations operated by the Drainage Board pump directly into the River Humber at Crabley Creek. The canal is tide-locked, as water levels in the Humber exceed those in the canal for much of the tide cycle, and water only drains out of the system at lower states of the tide. Approximately 50% of the drainage catchment lie below the level of high water on the Humber, and so the drainage function is vital to the livelihood of the area.
The Route
The navigation starts at Weighton Lock, which is bi-directional, due to the tidal range of the River Humber. It crosses flat fenland to the north of the lock, passing under the Selby to Hull railway bridge and bridges carrying the B1230 road at Newport and the M62 motorway, which have restricted the headroom available for boats to about 9 feet (2.7 m). Above Sandholme Landing, the canal is joined by the River Foulness entering from the left, and about 1.2 miles (1.9 km) further on lies the derelict Sod House lock, the current head of navigation. Much of the canal beyond has been filled in, although drainage channels closely follow its route. There were two more locks, Mill lock and Holme Ings lock, and the canal terminated at Canal Head, about 0.6 miles (0.97 km) further on, and 2 miles (3.2 km) short of the town of Market Weighton. A short branch, the Holme Canal, turned off to the left immediately above Holme Ings lock, and remains in water. Above the junction with the River Foulness, the channel is heavily silted and navigation is difficult in all but the smallest boats.

THE TRANS PENNINE TRAIL

The Trans Pennine Trail is a multi-user route across the North of England from Southport to Hornsea, with north - south route from Leeds to Chesterfield, plus a spur to York.

The TPT is mapped and signed all the way. It is mainly traffic free. Easy gradients and surfaced paths make sections suitable for families, gentle exercise and people using wheelchairs and pushchairs.

The concept of the TPT first emerged in 1987 when a feasibility study proposed a long distance route predominantly using old railway lines. In 1988, a meeting of interested parties was called by Barnsley MBC which resulted in a unique partnership of Local Authorities agreeing to work together to develop the route. The Trans Pennine Trail was formally launched with an inaugural walk and cycle ride in May 1989 between Southport and York.

Sections of the route were gradually developed as funding could be secured. In 1997, the project secured £5.3m from the Millennium Commission to complete the route, which was officially opened on 13 September 2001.

The Trans Pennine Trail is a key part of the National Cycle Network in the north of England - this is a network of 10,000 miles of walking and cycle routes across the country developed by Sustrans.

In July 1996 the Trans Pennine Trail was designated as the British section of the E8 European Long Distance Walking route

Additional Hints (Decrypt)

Oruvaq srapr cbfg.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)