Skip to content

HC Denver, South Park and Pacific Railroad Traditional Cache

This cache has been archived.

IgnotusPeverell: Greetings. I'm IgnotusPeverell, one of the volunteer reviewers for geocaches submitted to Geocaching.com.

I can't find any recent responses from tsnyder88 about maintaining this cache which makes it appear they are either unwilling or unable to maintain this geocache. Cache maintenance includes: replacing broken or missing containers, replacing full or wet logs, updating any changes to the text, updating coordinates, removing the needs maintenance attributes, enabling the listing, and more. Check out all of a geocache owner's responsibilities here. This cache is being archived, and removed from the active cache listings.

"If a geocache is archived by a reviewer or staff for lack of maintenance, it will not be unarchived."

Thanks for your understanding,
IgnotusPeverell
Volunteer Reviewer for Colorado and New Mexico
[?] Geocaching.com Help Center [?]

NOTE: Please do not reply by leaving a note on this geocache. I am not notified if a note is posted to this page. If you wish to respond to this message from the geocaching.com mail bot, go to your cache page and e-mail IgnotusPeverell from the log there, or email me directly at IgnotusPeverellReviewer@gmail.com, referencing the geocache GC Code and/or link.

More
Hidden : 5/15/2010
Difficulty:
2 out of 5
Terrain:
3 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Related Web Page

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

Denver, South Park and Pacific Railroad

more info at http://en.wikipedia.org/wiki/Denver,_South_Park_and_Pacific_Railroad

congratulation to sassydil on FTF

The company's main line was 3 ft (914 mm) gauge and went from Union Station in Denver up the valley of the South Platte River to the town of South Platte, then followed the North Fork of the South Platte through Buffalo Creek and Bailey. West of Bailey the route along North Fork and through the north end of the Tarryall Mountains essentially followed the route of present-day U.S. Highway 285 to Como, where it branched northward (see below). From Como the main line transvered South Park to Garo, where a spur went northward to Fairplay and Alma. The main line continued south over Trout Creek Pass. On the western side of the pass, a small spur of the main connected to Buena Vista, then traversed the southern end of the Sawatch Range through the Alpine Tunnel to Pitkin an

The company was incorporated in the Colorado Territory as the "Denver, South Park and Pacific Railway" on October 2, 1872 with 2.5 million dollars in capital. Less than a year later, on June 16, 1873, it was reorganized by John Evans as the "Denver, South Park and Pacific Railroad" with an increased capitalization of 3.5 million dollars. Construction from Denver to Morrison began in August, 1873, by the Denver Railway Association, following approval by Arapaho County Voters who passed a $300,000 Bond Issue. On June 20, the tracks reached Morrison, and on July 3, scheduled service began between Denver and Morrison, with two 2 round-trip mixed trains per day. This branch would provide a healthy income from the start, shipping stone, lumber, and coal from Mt. Carbon. However, the financial panic in 1873, precipitated by Jay Cooke & Co. of Philadelphia (financiers of the Northern Pacific Railroad), caused a reduction in traffic, resulting in reduced construction until 1876. During this period, the Denver, South Park and Pacific Railroad struggled to remain solvent.
The tracks reached the mouth of the Platte Canyon on May 4, 1878, 20 miles (32 km) from Denver, and by June 2, the tracks reached 12 miles (19 km) up the canyon. The tracks reached Buffalo Creek on June 17. The following year, on May 19, 1879, the tracks reached to the summit of Kenosha Pass and on June 27 they reached Como. The railroad was earning about $1,200 a day, with only a daily operating expense of $480. This made the railroad very profitable, while also allowing a steady flow of money to help with construction cost. In November 1879, with the tracks only as far as South Park, the company contracted for the initial construction of the Alpine Tunnel, with an expected finish date of July 1, 1880. The following month, the tracks reached to the summit of Trout Creek Pass.

Additional Hints (Decrypt)

haqre n ebpx

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)