Skip to content

Big Muddy Bridge Traditional Cache

Hidden : 1/17/2011
Difficulty:
2 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

This is a small comoed prescription container. It should be a rather quick grab. Should be available year around providing the snow isn't to deep during the winter. Limited handicap accessible.

This bridge is an example of the Federal Govt.s Stimulis Money; it would have been build in a couple of years, if not for the Stimulus package. It was started in 2009 and will be finished in 2011 at the cost of $2.48 million. Details: Old Bridge-wooden, (15 spans) 300' long,20' wide; over 60yrs old. New Bridge - Concrete,(5 spans) 311' long, 36' wide. Concrete pour was 454 CY plus the beams, Rebar weighed 72,701 lbs. placed in the concrete. Sletten Construction Co. was the prime and they had 6 subcontractors.

Additional Hints (Decrypt)

Abg whfg lrg.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)