Big Muddy Bridge Traditional Cache
-
Difficulty:
-
-
Terrain:
-
Size:
 (micro)
Please note Use of geocaching.com services is subject to the terms and conditions
in our disclaimer.
This is a small comoed prescription container. It should be a rather quick grab. Should be available year around providing the snow isn't to deep during the winter. Limited handicap accessible.
This bridge is an example of the Federal Govt.s Stimulis Money; it would have been build in a couple of years, if not for the Stimulus package. It was started in 2009 and will be finished in 2011 at the cost of $2.48 million. Details: Old Bridge-wooden, (15 spans) 300' long,20' wide; over 60yrs old. New Bridge - Concrete,(5 spans) 311' long, 36' wide. Concrete pour was 454 CY plus the beams, Rebar weighed 72,701 lbs. placed in the concrete. Sletten Construction Co. was the prime and they had 6 subcontractors.
Additional Hints
(Decrypt)
Abg whfg lrg.
Treasures
You'll collect a digital Treasure from one of these collections when you find and log this geocache:

Loading Treasures