The Pipeline is the approximately 15 km long water supply system
that was used by the pulp and paper mill located in the city of
Miramichi.
Even though the mill was located beside the Miramichi River, the
salt content of the main branch of the river was too high for the
paper making process so water had to be pumped from one of the
tributaries. They chose to build the pump house along the Southwest
Miramichi River in Bryenton.
A more detailed description of this series can be found at
#1 Pipeline Series.
The cache contains only a log so you will need to bring a
pencil.