Bluegrass Railroad Museum Traditional Cache
FJ40thom: another owner wants to rehide
More
Bluegrass Railroad Museum
Please note Use of geocaching.com services is subject to the terms and conditions
in our disclaimer.
The Louisville Southern Railway built this line in 1888 to connect Louisville and Lexington. After the acquisition and expansion of the Versailles and Midway, through trains from Louisville to Cincinnati were operated over the line for a short time. The last trains to operate over the high bridge at Tyrone was in the 1980's.
From Lexington to Versailles, the line is operated by R.J. Corman, but from Versailles to the bridge over the Kentucky River, the Bluegrass Railroad Museum runs excursions on the weekends.
Additional Hints
(Decrypt)
zntargvp
Treasures
You'll collect a digital Treasure from one of these collections when you find and log this geocache:

Loading Treasures