Shaftesbury Park. Spring Brook park
A very small cache you will need to bring a pen with you
The renavation began in March 1999 and was completed in May 2000. It required the excavation of a new natural channel, 130 metres long, and the subsequent removal of the old concrete channel. The river restoration included the construction of two gravel beaches to allow safe and easy access to the river, a path along its length and a blockstone bridge for safe crossing. A pond was also created next to the river to provide a variety of still water habitats to attract different animals and plants.