Had planned to place a cache here in January but when we arrived after the worst of the floods had subsided we found quite a few workers with little tractors busily pushing lorry load after lorry load of stone and shale off the side of the road as they tryed to rebuild the embankment that had been washed away, electric poles and power cables had all fallen over as the road slowly disappeared and now 5 months later the road looks a bit better in a very rough sort of way but the poles are still all over the place and power cables on the ground.