Oh Smelly Traditional Cache
BouncingBall: time to go got new plans for this area
More
-
Difficulty:
-
-
Terrain:
-
Size:
 (other)
Please note Use of geocaching.com services is subject to the terms and conditions
in our disclaimer.
a quick stop near the new WATER TREATMENT PLANT at Dunbar
MIND THE BONUS NUMBER
The Dunbar Wastewater Treatment Plant is an Activated Vertical Loop Reactor. It was designed to treat a dry weather flow of 2,230,000 gallons per day with a wet weather capacity of 5,600,000 gallons of flow per day. The plant operation begins as the wastewater enters the plant at a self-cleaning bar screen with compactor combined with a grit chamber with grit washer to remove trash. The wastewater will enter three vertical loop reactor tanks, nine disc aerators, and three supplemental blowers to begin the cleaning process. The two clarifiers act as the settling area for separation of the water from solids. The water on the top of the clarifiers travels to the chlorination tanks for disinfections, then to the de-chlorination tanks before it is discharged into the Kanawha River. The solids are transferred into a sludge thickener before the final process in the aerobic digester. The sludge from the digester is transferred to the belt press, a post line stabilization facility, where additional liquids are removed. Finally, the remaining solids are transported to the landfill for disposal.
Additional Hints
(Decrypt)
vil gerr (35zz)
Treasures
You'll collect a digital Treasure from one of these collections when you find and log this geocache:

Loading Treasures