Skip to content

Don't ask me "Y" Bird Mt. Traditional Cache

This cache has been archived.

Silly girl. :): There is a house near this cache site and with the world turning the way it has people stopping here may upset them so I removed this cache.

More
Hidden : 11/25/2012
Difficulty:
1.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

Watch For Traffic and Trains!


Easy Park and Grab.
Area CAN BE SLICK in winter.
Congratulations to Totem Clan (and Otter) & 2 Moore for your FTF.

ODOT is responsible for nearly 30,000 lane miles of roads. That is the same distance as if you drove from Oklahoma City to Los Angeles and back 11 times. More than 3,000 miles of our 12,266 miles of highway in Oklahoma need to be rehabilitated or replaced due to inadequacies. This is 25% of our highways. Inadequate roadways include those which have no shoulders, narrow lanes, deteriorated pavement, no or few passing areas (restricted by geography), large curves and/or too much traffic. Approximately 1/3 of Oklahoma’s driving surfaces are in “poor” condition which amounts to around 4,300 miles. Oklahoma has about 670 centerline miles of non-toll interstate. When measured for roughness, almost 50% of Oklahoma interstates rate fair, mediocre or poor, compared to a national average of 35%. There were over 56 million highway miles driven in 1995. That number has grown to over 65 million in 2003, a 13.8 percent increase in 8 years. Current traffic growth projections indicate a 33 percent increase in cars on highways and at the same time a 70 percent increase in trucks on Oklahoma interstates in the next 20 years. The American Trucking Association projects about a 50% increase in freight movement on highways in the next 10 years. The Association of American Railroads reports a minimum increase of 50% in rail freight in the next 20 years. ODOT productivity has risen steadily despite staff reductions of almost 825 people since 1991 – from 3,223 to under 2,400 today. Approximately 150 bridges have restricted load limits, resulting in extra detours and nagging delays for drivers.

Additional Hints (Decrypt)

Uvag pbzvat znlor va jnezre jrngure.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)