Skip to content

Splityard is Buzzing Traditional Cache

Hidden : 9/7/2013
Difficulty:
2 out of 5
Terrain:
2 out of 5

Size: Size:   regular (regular)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

Splityard Creek Dam was completed in 1980. The dam wall is constructed from earth and rock fill and is 1150 metres long. Water capacity is 28,700 megalitres.


The dam is filled by pumping water from the nearby Wivenhoe Dam. This water is used to drive two turbines generating 500 megawatts before returning to Wivenhoe Dam. The cache is located near the lookout, be sure to visit it and enjoy the view. Whilst you're there you'll hear the electrical power buzzing through the overhead high voltage lines, hence the name of the cache.

You are looking for a one litre camo painted Systema container. When placed it contained logbook, pen, and swaps. Please ensure you cover the cache well when replacing. Thanks.

Additional Hints (Decrypt)

gerr sbex

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)