Skip to content

HEX Series - Bakers Lane Mystery Cache

This cache has been archived.

Chippyroo: Haven’t had a chance to check the cache so have decided to archive it to open area up for other hiders.

More
Hidden : 11/6/2013
Difficulty:
3.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

A series about the Hunter Expressway

The Hunter Expressway is a vital link between the M1(F3) at Seahampton and the New England Highway at Branxton. It is a 39.5-kilometre long dual carriageway freeway with two lanes in each direction. Funding of $1.5 billion for the road construction was announced in the 2009 Australian federal budget, and construction commenced on 11 August 2010. The original contracted opening date was September 2013, but construction delays caused this to be delayed until January 2014.

The project will be completed in two sections. The first stage was awarded to Thiess in a joint venture alliance with Parsons Brinckerhoff and Hyder Consulting. They had the task of constructing the first 13 kilometres from the M1 to Kurri Kurri, while the 27 kilometres from Kurri Kurri to Branxton was awarded to AbiGroup (RMS 2014).

Mr Chippyroo worked on the construction of the AbiGroup section of the project, while he was there he performed general labouring duties, the operation of 20 tonne rollers and an 825H compactor.

Because of the length of the job, the requirement for multiple compounds was required. Just near GZ you may see where the compound and lay down areas were.

Below are the coordinates for the cache as the cache is not at the listed coordinates.

FHUUE LJQTR FBGFK BABRH QRNQR RRFBR HQRNQ VGBRR ERGRG FKBAR TGHQR NQARB AQEAU UVGVC VLAJF RTQAL SSAQE AUAGN AIFAQ EAUAG VCVLE SRERB GGVGG B

References:

Glenn Harvey (Background image) (visit link)

Roads and Maratime Services. Last Update: 22 January 2014. Road Projects: Hunter Expressway (visit link)

Additional Hints (No hints available.)