Skip to Content

This cache has been archived.

Thymallus Thymallus: Cache archived.

More
<

Syntymäpäivälahja - Birthday present 2.0

A cache by liinakar Send Message to Owner Message this owner
Hidden : 12/26/2013
Difficulty:
1.5 out of 5
Terrain:
1.5 out of 5

Size: Size: small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

Uusi versio jo pariin kertaan tuhoutuneesta purkista. Jästialtisalue läheisen koulun takia.

Cache at the new swimming hall. High muggler risk due the school close by.


Porin kaupunginvaltuusto päätti 450-vuotisjuhlakokouksessaan 8.3.2008 rakentaa Poriin uuden uimahallin. Uimahallin avajaiset on Porin Päivänä syyskuussa 2011.

Aurinkoenergiaratkaisu ainutlaatuinen Suomessa
Uimahallin energiaratkaisussa optimoidaan monen järjestelmän yhteiskäyttö. Suunnittelussa on kiinnitetty erityistä huomiota tilojen ja allasvesien energiansäästöön, energian talteenottoon sekä tapaan, jolla energia tuotetaan. Täysin uusina julkisten tilojen energiaratkaisuna uimahalliin on suunniteltu aurinkoenergiaa hyödyntävät aurinkopaneelit hallin sähköntuottoon ja aurinkokeräi¬met allasvesien lämmitykseen.
Pori on hankkeellaan edelläkävijä, sillä tuleva aurinkoenergiaratkaisu on maan ensimmäinen uimahalliin tehty aurinkoenergiainvestointi ja sellaisena merkittävä ympäristöteko.
Aurinkolämpökeräimillä tuotetaan uimahalliin energiaa 120 000 kWh, joka vastaa kuuden keski¬verto-omakotitalon vuoden lämmityskuluja ja kattaa 5 % uimahallin vuotuisesta lämmöntarpeesta. Aurinkosähköpaneelit tulevat tuottamaan noin 45 000 kWh eli 3 % rakennuksen kuluttamasta sähköstä.

ENG:
In the 450th Jubilee meeting of Pori City Council on 8.3.2008, the decision was taken to build a new swimming pool complex in Pori. The inauguration of the pool complex is on the “Pori Day” of September 2011.

Unique solar energy solution for Finland
The energy solution for the swimming pool complex optimises the joint use of many systems. Special attention has been paid in the design to energy saving and recovery at the pool complex, and to the way in which the energy is produced. As a brand-new energy solution for public facilities, the design includes solar-powered panels to produce electricity for the complex and solar collectors to heat the pool water.
Solar heat collectors will generate 120 000 kWh of energy for the complex, corresponding to the annual heating costs of six average detached houses and covering 5 % of the annual heat requirements of the swimming pool complex. The solar panels will produce approximately 45 000 kWh or 3 % of the electricity consumed by the building.

Additional Hints (Decrypt)

Rxn iäyv gnxnan

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)



 

Find...

645 Logged Visits

Found it 616     Didn't find it 13     Write note 4     Archive 1     Temporarily Disable Listing 1     Publish Listing 1     Needs Maintenance 3     Owner Maintenance 3     Update Coordinates 2     Post Reviewer Note 1     

View Logbook | View the Image Gallery of 5 images

**Warning! Spoilers may be included in the descriptions or links.

Current Time:
Last Updated:
Rendered From:Unknown
Coordinates are in the WGS84 datum

Return to the Top of the Page

Reviewer notes

Use this space to describe your geocache location, container, and how it's hidden to your reviewer. If you've made changes, tell the reviewer what changes you made. The more they know, the easier it is for them to publish your geocache. This note will not be visible to the public when your geocache is published.