Skip to content

Pilies tiltas Traditional Cache

This cache has been archived.

Leptoceratops: Hello!
I'm archiving your cache as it has been disabled for more than a one month and it is lost or completely damaged. Usually caches are visited and maintained within 30 days after disabling.
If you wish to unarchive your cache then please contact me using GC code or link of this cache.

If there are still leftovers from container I would appreaciate if other players could collect them so that there are no trash in the nature.

Happy geocaching!

More
Hidden : 12/26/2014
Difficulty:
2 out of 5
Terrain:
2.5 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

[LT] Pilies tiltas. Lobiukas skirtas informacijai apie atnaujinto tilto kapitalinį remontą (pagaliau atlikta). Magnetinis.Parkavimas mokamas darbo dienomis nuo 8 iki 18 valandos. Rekomenduojama nakties metu. Turėkite su savimi savo rašiklį.
[EN] Castle Bridge. Cache is for information about the bridge repair (it's done finnaly). Magnetic. Paid parking on workdays from 8 to 18 hours. Recommended at night. BYOP.


-----[LT]-----

Tilto remonto rangos sutartis buvo pasirašyta 2013 metų spalio 22 dieną.
Tiltas eismui uždarytas 2014-ųjų metų kovo 15 dieną,
Tiltas po remonto atidarytas 2014-ųjų metų gruodžio 19 dieną.

 
 
 

Atliekant Pilies tilto gatvėje per Danės upę kapitalinį remontą buvo atlikti šie darbai: suremontuotos metalinės ir gelžbetoninės laikančiosios tilto konstrukcijos, atlikti hidraulinės tilto pakėlimo sistemos remonto darbai, pakeistas tilto pakėlimo mechanizmas, sistema automatizuota, atlikti paviljono vidaus ir išorės apdailos darbai, naujai įrengta pakeliamos tilto dalies ir prietilčių važiuojamosios dalies danga.

Taip pat atlikti kelio žymėjimo darbai, sumontuoti eismo reguliavimo ženklai, šviesoforai, naujai įrengti ir suremontuoti pėsčiųjų ir dviračių takai, pėsčiųjų takai pritaikyti žmonių su negalia judėjimui, įrengti 4 pakeliami kelio užtvarai, kurie užtvers automobilių eismą tilto pakėlimo metu, sumontuoti inovatyvūs šviestuvai su atsinaujinančios energijos šaltiniais (8 vnt.), sumontuoti nauji porankiai su apšvietimo lemputėmis, suremontuotas esamas pėsčiųjų tunelis bei krantinės.

Tilto remonto darbų kaina: 13 mln. 921 tūkst. 196 Lt.

 
 

Prieš pradedant Pilies tilto remontą buvo priimti kompleksiniai eismo perorganizavimo mieste sprendimai. Kai kurie jų, eismo specialistų nuomone, pasitvirtino ir bus palikti bent kurį laiką galioti ir atidarius eismą tiltu, jeigu tik gyvenimas nepadiktuos kitaip, o kai kurie - panaikinti, ir eismo režimas grąžintas į ankstesnę būklę.

Pilies tilto remontas baigtas per 9 mėnesius.


-----[EN]-----

Bridge repair contract was signed in 2013, on October 22.
The bridge was closed to traffic 2014 March 15,
The bridge was opened in 2014 after the repair of the Year on 19 December.

The Castle Street Bridge over the River Dane major repairs were carried out following works: repaired and reinforced concrete load-bearing metal bridge construction, bridge on the hydraulic lift system works, changed the bridge lifting mechanism, the automated system, perform the pavilion internal and external finishing works, newly equipped with a lift bridge part prietilčių and coating driveways.

Also carry out road marking works, whether traffic control signs, traffic lights, newly renovated and equipped with pedestrian and bicycle paths, hiking trails adapted for people with disabilities movement, with 4 lift road barriers that užtvers car traffic during bridge lift, mounted lamps with innovative renewable energy sources (8 pcs.), fitted with armrests new light bulbs, renovated existing pedestrian tunnel and the berth.

Bridge repairs cost: 13 million. 921 thousand. 196 Lt.

Before the Castle Bridge repairs have been adopted in the re-engineering complex traffic solutions. Some of them, traffic specialists, proven and will leave at least some time in force and opening the bridge to traffic, if only life nepadiktuos otherwise, and some - to liquidate, and traffic mode returned to the previous state.

Castle Bridge repairs completed within 9 months.

Mieste baigtas ypatingas projektas nuotrauka, foto
© Egidijaus JANKAUSKO nuotr. ve.lt

Additional Hints (Decrypt)

[LT] cveznf. cevfvgenhxvznf. ||| [EN] svefg. chyy-hc.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)