Skip to content

Eolu u posjeti / Visiting Aeolus Traditional Cache

Hidden : 11/9/2015
Difficulty:
2.5 out of 5
Terrain:
4 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:



HR

1998. godine na Ravnama su postavljeni mjerni instrumenti za praćenje smjerova i brzine vjetra. Rezultati su pokazali da na Pagu ima oko 1600 vjetrovitih sati godišnje, da je godišnji prosjek brzine vjetra između 6 i 6,5 m/s, tj. središnje su se brzine vjetra pokazale dovoljne za komercijalnu izgradnju vjetroelektrana. 

Vjetroelektrana Ravna 1 je prva vjetroelektrana u Hrvatskoj. Izgrađena je na predjelu Ravne na otoku Pagu iznad paške solane, montirana 19.kolovoza 2004. Vjetroelektrana ima nazivnu snagu 5,95 MW koju proizvodi sedam generatora tipa Vestas V52, pojedinačne snage 850 kW. 7 godina je trebalo za realizaciju ovog projekta, gradnja je trajala 4 mjeseca,a tvrtka Adria Wind Power je uložila 6,5 milijuna eura. .

Vjetroelektrana godišnje proizvodi oko 15 milijuna kWh električne energije. Grad Pag dobiva naknadu jer se vjetroelektrane nalaze na njegovom području.

Vjetroelektrana Ravna 1 je danas dio otočnog krajolika i turistička atrakcija.Redovito ih posjećuju učenici i studentske grupe iz raznih škola u Hrvatskoj.

 

Eolu u posjeti / Visiting Aeolus

EN

1998 at Ravna were placed measuring instruments to monitor wind direction and speed. The results showed that the Pag has about 1,600 windy hours per year, that is the annual average wind speed of between 6 and 6.5 m / s, ie. The average wind speed was sufficient for commercial construction of wind farms.

The wind farm Ravna 1 is the first wind farm in Croatia. It was built in the area Ravne on the island of Pag above the Pag salt pans, mounted on 19 August 2004. The wind power plant has a rated output of 5.95 MW , produces by seven generators type Vestas V52, with individual power of 850 kW. It took seven years to realize this project, the construction lasted 4 months, and the company Adria Wind Power has invested 6.5 million EUR. 

The wind farm produces about 15 million kWh of electricity per year. The town of Pag gets compensation for the wind farm which is located on its territory.

The wind farm Ravna 1 is now part of the island landscape and a tourist attraction. It is regularly visited by school and student groups from all over Croatia.

Flag Counter

Additional Hints (Decrypt)

Vmn xhpvpr, irmna hmvpbz mn xnzra / Oruvaq gur ubhfr, gvrq gb n fgbar

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)