Skip to content

Switch Up The Sign Traditional Cache

Hidden : 1/26/2016
Difficulty:
2.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

This cache is only big enough for a log. Please bring your own utensil as there isn't enough room to keep one


        The highly automated $60 million facility spans the equivalent of 20 American football fields under a single roof, with conveyor lines inside stretching for more than five miles (8.5 km.). The Cheyenne center handles more than 25,000 items, ranging from paint to power tools to ceiling fans to lawn mowers. 
        The center will joined five existing regional U.S. distribution centers (as of early 2000's), as well as new regional centers in Perris, Calif., and Findlay, Ohio built around the same time. 
        The Wyoming center's heaviest focus is within a 300-mile (510-meter) radius, but it will supply stores as far away as 600 miles (1,020 km.).

        Be sure when you stop by to park out of the way of those working... No need to impead :)

Congrats to dragonlover13 for being the first to find!

Additional Hints (No hints available.)