Skip to content

Erie canal longway level rest stop Traditional Cache

Hidden : 6/29/2016
Difficulty:
1.5 out of 5
Terrain:
1.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

Quick park and grab micro container. Make sure to bring your own pen and may need a tool to get the log at times. Congratulations to MrBirder on FTF!

Construction of the Erie canal began at Rome on July 4th, 1817 to take advantage of the "long level". That portion of the canal between Utica and Syracuse. In October 1819. The 98 mile section between Utica and Seneca river was complete and the first boat traveled from Rome to Utica. When finished in 1825, the Erie Canal became the main route between the Atlantic Ocean and the Great Lakes. The modernized State Barge Canal System consisting of the Erie Champlain. Oswego and Cayuga Seneca Canals was complete in 1918.

Additional Hints (No hints available.)