The 72-metre swing bridge 'Wild at Heart' was completed in December 2016 and the final stretch of track above the swing bridge was completed in May 2016. Built by Abseil Access who have extensive experience designing and building suspension bridges including completed bridges on the Old Ghost Road in the upper West Coast.
Before this swing bridge there were only two difficult options to make it to the top, the 4WD Snake Charmer route, or a via Missing Link.
You are looking for a small cameo cache before you cross the bridge. No need to leave the path or go past the sign.