Helpston level crossing itself carries the Helpston to Glinton road over the four tracks of the ex-GNR line and the two tracks of the ex-MR line. This was previously two separate level crossings, controlled by two separate signal boxes. There was space for two cars between the level crossings. The crossings were merged and converted from gates to full barriers in the 1970s.
2 October 1846 Opened as Helpstone
1 July 1858 renamed Helpstone for Market Deeping
1 May 1877 renamed Helpston for Market Deeping
1 May 1912 renamed Helpston
You will need to bring a pen to sign this cache. (Magnetic)