Skip to content

La centrale termica Traditional Cache

Hidden : 2/1/2020
Difficulty:
1.5 out of 5
Terrain:
1 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


La Centrale Termica
 
FTF :  The Fr3aks - 22/02/2020 h: 10:15

______________________________________________________________________________________________________________________________

[ITA]

Cinque ciminiere ed un tripudio di tubi, cosi' Vi appare la centrale termica di mirafiori non appena la raggiungete. La Centrale Termoelettrica nasce nel 1939, anno d’inizio della costruzione del comprensorio industriale di Mirafiori. La prima sezione ad essere costruita è quella relativa alla Centrale di Alta Pressione (CAP), negli anni ’50 inizia la costruzione della Centrale di Media Pressione (CMP), nel 1979 vengono costruiti le due turbine a gas (TG16), e nel 1990 i due impianti a Ciclo Combinato (CICO).  

La Centrale ha subito un graduale e significativo potenziamento dovuto alle aumentate esigenze energetiche del comprensorio industriale di Mirafiori. Negli ultimi dieci anni però i fabbisogni di energia termica ed elettrica del comprensorio sono diminuiti per stabilizzarsi negli ultimi due anni; conseguentemente sezioni della Centrale Termoelettrica non sono state più sfruttate appieno. Attualmente la Centrale di Media Pressione e i Turbogas sono utilizzati solo in caso di emergenza. Da circa cinque anni, l’energia elettrica prodotta non assorbita dal comprensorio viene venduta a terzi.

La Centrale Termoelettrica di Mirafiori utilizza come combustibile solo gas naturale ed ha una potenza termica installata pari a 586,88 MWt ed una elettrica pari a 206,88 MW. 

Essa è costituita da quattro sezioni: 
Media Pressione :
4 caldaie che operano a 23 Bar e 320°C, ha 3 turbine a contropressione ognuna da 4,8 MW 

Alta Pressione 
3 caldaie che operano a 100 Bar e 505°C, ha 2 turbine da 17 MW e una da 11,46 MW

Turbine a gas
2 Turbine dette TG16, da 19,5 MW funzionano con i fumi incombusti inviati in due caldaie con potenza di 50,88 MWt

Ciclo Combinato. 
Costituito da 2 impianti,da 54 MW costituiti da una turbina a gas accoppiata ad una a vapore a condensazione. La potenza termica totale delle due caldaie e' di 96 MWt.

[ING]

Five chimneys and a riot of pipes, so the Mirafiori thermal power plant appears as soon as you reach it. The thermoelectric plant was born in 1939, the year in which construction of the Mirafiori industrial area began. The first section to be built is that relating to the High Pressure Plant (CAP), construction of the Medium Pressure Plant (CMP) began in the 1950s, two gas turbines (TG16) were built in 1979, and two combined cycle plants (CICO) in 1990. The plant has undergone a gradual and significant expansion due to the increased energy needs of the Mirafiori industrial area. In the past ten years, however, the district's heat and electricity needs have decreased to stabilize in the past two years; consequently sections of the thermoelectric plant have not been fully exploited. Currently the Medium Pressure Plant and the Turbogas are used only in case of emergency. For about five years, the electricity produced not absorbed by the area has been sold to third parties. The Mirafiori thermoelectric plant uses only natural gas as fuel and has an installed thermal power of 586.88 MWt and an electric power of 206.88 MW.

It consists of four sections:
Medium pressure:
4 boilers operating at 23 Bar and 320 ° C, has 3 counter-pressure turbines each of 4.8 MW

High Pressure
3 boilers operating at 100 Bar and 505 ° C, has two 17 MW turbines and one 11.46 MW one

Gas turbines
2 Turbines called TG16, 19.5 MW, work with unburnt fumes sent in two boilers with a power of 50.88 MWt

Combined cycle.
Consisting of 2 plants, 54 MW consisting of a gas turbine coupled with a condensing steam turbine. The total thermal power of the two boilers is 96 MWt.

Flag Counter

Additional Hints (Decrypt)

Nymn yb fthneqb, dhry pur irqv r' dhry pur qriv prepner. Ybbx hc, jung lbh frr vf jung lbh arrq gb ybbx sbe.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)