Skip to content

Swansea Water Supply Traditional Cache

Hidden : 10/10/2020
Difficulty:
2.5 out of 5
Terrain:
2.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


CACHE IS AT THE LOCATION - This is a Field Puzzle.  Please locate tool nearby

 

In 2011 a dam feed by water off the Meredith river was completed after a construction period of more than two years.

The project has been delayed by recent heavy rain in the area and costs blew out by $500,000, as a result.

The total bill is now $9 million split between the State Government, local council and Southern Water.

Glamorgan Spring Bay mayor, Betrand Cadart, says the project is worth every cent.

He says it is the first time in the town's 166-year history that residents have not had to boil their drinking water.

 

As you would expect it was a huge boom for the tourist industry with tourists not having to boil their water before drinking.

Additional Hints (Decrypt)

Oruvaq Gerr, svaq gbby arneol gb ergevrir pnpur

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)