In 2011 a dam feed by water off the Meredith river was completed after a construction period of more than two years.
The project has been delayed by recent heavy rain in the area and costs blew out by $500,000, as a result.
The total bill is now $9 million split between the State Government, local council and Southern Water.
Glamorgan Spring Bay mayor, Betrand Cadart, says the project is worth every cent.
He says it is the first time in the town's 166-year history that residents have not had to boil their drinking water.
As you would expect it was a huge boom for the tourist industry with tourists not having to boil their water before drinking.