Skip to content

Hwy 97 By-Pass Traditional Cache

Hidden : 3/20/2021
Difficulty:
1.5 out of 5
Terrain:
2.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


From This Vantage Point you will be able to see the construction of the Proposed Highway 97 By-Pass that is suppose to start construction in the Spring of 2022. The By-Pass will extend from just North of Cooley Rd., paralleling the BNSF Rail Tracks, and connect into the exisiting By-Pass at Empire Rd. Once the Construciton is completed in about 2 years from Starting of the construction, Travellers will be able to drive uninterrupted from SW Odem Medo Way in Redmond to the Powers Rd. traffic control device in The South end of Bend, Oregon USA.

Additional Hints (Decrypt)

Guvf jvyy ABG Fghzc Lbh.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)