these old stone buildings were bunkhouses for the tunnel watchman the switch tower was here for the tunnel there is a old road that went down behind here to the main road now the tunnel has so much water flowing from it i has created a stream that flows down the old road the tunnel is 3.855.0 ft long and impassable because of flooding this is the tunnel that ran under the shawanguk ridge from highview station to mamakating station and the switch tower was about 470ft from the tunnel entrance on the mamakating side
the answer for the final what is the name of the tunnel
n41 34.xxx
the wurtsboro tunnel 200
the highview tunnel 137
the mamikating tunnel 160
w 074 28xxx
what year was the tunnel completed
1867 , 200
1876 ,240
1871 ,193