Welcome to the Mallard Creek Greenway! Starting at Kirk Farm Park and ending in the Brookstone neighborhood near W.T. Harris Blvd, the greenway is one of the largest in the region with a total length of 4.7 miles. While mostly paved, the greenway does feature a 1.2 mile section of gravel through the entirety of the University Research Park. It connects with the Toby Creek Greenway, Barton Creek Connector, and Clarks Creek Greenway acting as the backbone for the university area network of greenways.
This cache is one of many I plan to hide over time along all of the university area greenways. This specific cache is located at the west end of the gravel section through University Research Park. A push was made in 2017 for the city to finally pave the section, but nothing has changed since then. Regardless, it is still a beautiful and open section of the greenway with some great views of the creek towards the west end.