Welcome to the Mallard Creek Greenway! Starting at Kirk Farm Park and ending in the Brookstone neighborhood near W.T. Harris Blvd, the greenway is one of the largest in the region with a total length of 4.7 miles. While mostly paved, the greenway does feature a 1.2 mile section of gravel through the entirety of the University Research Park. It connects with the Toby Creek Greenway, Barton Creek Connector, and Clarks Creek Greenway acting as the backbone for the university area network of greenways.
This cache is one of many I plan to hide over time along all of the university area greenways. This specific cache is located at the current end of the greenway. While no plans are in motion at this time, the greenway is very obviously set up to continue on west. Something I would love to see in the future!