Skip to content

M2L - Wind Farm Traditional Cache

Hidden : 4/23/2024
Difficulty:
1 out of 5
Terrain:
1.5 out of 5

Size: Size:   small (small)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


This cache is part of the Moffat to Leadhills (M2L) series placed for the Caledonian Cachefest 2024. 

The Clyde Wind Farm is the biggest windfarm in Scotland and one of the biggest in Europe with over 200 turbines. The wind farm is open to the public to walk on and explore (excluding areas under construction). 

This cache is placed at one of the entrances. There is space to park but please do not block access. 

Additional Hints (Decrypt)

Onfr bs cbfg

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)