GH6710: River stop bank maintenance underway, this will eventually be moved to the new road below.
GCAQQ55 ▼
Size:  (micro)
The Whale Trail is under construction to link Picton and Kaikoura with a fantastic Cycle and walking trail. This section through Spring Creek follows the Wairau River flood protection stop bank and at this point also Spring Creek.
Additional Hints (Decrypt)
Decryption Key
A|B|C|D|E|F|G|H|I|J|K|L|M ------------------------- N|O|P|Q|R|S|T|U|V|W|X|Y|Z
(letter above equals below, and vice versa)
What are Attributes?
Advertising with Us
You'll collect a digital Treasure from one of these collections when you find and log this geocache: