Skip to content

Did you know? Event Cache

This cache has been archived.

Geocaching HQ Admin: Thank you for hosting this geocaching Event! The date of the Event has passed. We automatically archive Events after 30 days (60 days for Mega- and Giga-Events). Attendees can still log archived Events, log trackables, and share their experiences.

More
Hidden : Saturday, July 6, 2024
Difficulty:
1 out of 5
Terrain:
1 out of 5

Size: Size:   other (other)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

06 July 2024, 11:00 - 13:00

Date: 6th July

Time: 11 - 1pm

Location: Stokers Arms

Meals and drinks for your own account. Hope to see you then

 

An interesting urban legend about railroad tracks

 

The US standard railroad gauge (width between the two rails) is 4 feet, 8.5 inches. That's an exceedingly odd number. Why was that gauge used?

 

Because that's the way they built them in England, and the US railroads were built by English expatriates.

 

Why did the English build them like that? Because the first rail lines were built by the same people who built the pre-railroad tramways, and that's the gauge they used.

 

Why did "they" use that gauge then? Because the people who built the tramways used the same jigs and tools that they used for building wagons which used that wheel spacing.

 

Okay! Why did the wagons have that particular odd wheel spacing? Well, if they tried to use any other spacing, the wagon wheels would break on some of the old, long distance roads in England, because that's the spacing of the wheel ruts.

 

So who built those old rutted roads? The first long distance roads in Europe (and England) were built by Imperial Rome for their legions. The roads have been used ever since. And the ruts in the roads? Roman war chariots first formed the initial ruts, which everyone else had to match for fear of destroying their wagon wheels. Since the chariots were made for (or by) Imperial Rome, they were all alike in the matter of wheel spacing.

 

The United States standard railroad gauge of 4 feet, 8.5 inches derives from the original specification for an Imperial Roman war chariot. Specifications and bureaucracies live forever. So the next time you are handed a specification and wonder what horse's ass came up with it, you may be exactly right, because the Imperial Roman war chariots were made just wide enough to accommodate the back ends of two war horses. Thus, we have the answer to the original question.

 

Now the twist to the story . . .

 

There's an interesting extension to the story about railroad gauges and horses' behinds. When we see a Space Shuttle sitting on its launch pad, there are two big booster rockets attached to the sides of the main fuel tank. These are solid rocket boosters, or SRBs. The SRBs are made by Thiokol at their factory in Utah. The engineers who designed the SRBs might have preferred to make them a bit fatter, but the SRBs had to be shipped by train from the factory to the launch site. The railroad line from the factory had to run through a tunnel in the mountains. The SRBs had to fit through that tunnel. The tunnel is slightly wider than the railroad track, and the railroad track is about as wide as two horses' behinds. So, the major design feature of what is arguably the world's most advanced transportation system was determined over two thousand years ago by the width of a Horse's Butt!

Additional Hints (No hints available.)