This is an easy 2 part multi-cache. The trailhead gate opens at 6 am and closes at 9 pm daily, be sure to mind your time returning to the parking lot. Some fun facts about the bridge:
Tallest and longest bridge in Los Angeles County
Type: Cable-stayed
Opened: October 5, 2020
Cost: $1.5 billion (valued $1.8 billion in 2024)
Total Length: 8,800 feet (1.7 miles or 2,700 meters)
Main span: 1,000 feet (300 meters)
Back Spans on both sides: 500 feet each (150 meters each)
Approach Spans on both sides: 2,800 feet (850 meters) on west approach; 2,600 on east approach
Height of Towers: 515 feet (157 meters)
Vertical Clearance: 205 feet (62 meters)
Width: 80 feet (24 meters)
Designed to last 100 years with minimal maintenance. Considered one of the most seismically-advanced structures in the United States.
Construction of the bridge required:
- 18 million pounds of structural steel (U.S.-made)
- 75 million pounds of rebar (U.S.-made)
- 1.7 million feet of steel cable (322 miles in combined length; also U.S.-made)
At WP 1 enter the 5 digit number to get the final coordinates.
You can validate your puzzle solution with
certitude.