Head down the steps from parking to check out the view of the Croche Dam.
The Rapide Croche Hydro Plant was constructed in 1925 – 1926 and houses (4) – 600kW turbine generators. Rapide Croche water levels for the upstream pool are controlled by adjustment of the tainter gates on the dam and wicket gates on the four turbines.
The dam at the site is known as the Rapide Croche Dam and is owned, operated, and maintained by the US Army Corps of Engineers.
Restrooms available seasonally. May not be winter friendly if a lot of snow.

Make sure to use the natural camo to keep the container hidden from muggles.
Permission to place cache granted by Brittany Simonson, Communications Specialist, Kaukauna Utilities.