About
SideTracked
We have Motorway Mayhem. We have A-Road Anarchy (cos there
aren’t many Motorways in Wales!). But what about public
transport users? SideTracked Caches are intended to provide quick
Cache-and-dashes at Train Stations.
It is hoped this idea will spread across the country in the same
way as the MMs….but if hiding one PLEASE BE SENSIBLE and
remember that in this day and age, public transport is under
greater scrutiny than ever before, so, although these caches should
be quick and easy grabs, PLEASE don’t place a Cache where it
could cause alarm!!!
For more information on SideTracked Caches, please visit SideTracked
About Newbury Station
Newbury station was opened on December 21st
1847 as part of the Berks and Hants line from Reading to
Hungerford. Newbury was an important junction on the Didcot,
Newbury and Southampton Railway (DN&SR), the first section of
which opened between Didcot and Newbury in 1881. The route to
Winchester was then opened in 1885 but it wasn't until 1891 that a
route to Southampton was completed.
By 1890 Newbury was an important station and
junction. There were two lines through the station covered by an
overall roof, plus a footbridge, turntable, goods yard and two bay
platforms. However, the expansion of the DN&SR and the later
opening of the LVR created a bottleneck in Newbury, especially for
express trains on the Reading to Plymouth line.
Between 1908 and 1910 the station was rebuilt
to extend the platforms and create two loops to ensure trains
stopping at the station did not block the line for express and
freight trains. Red brick was used for the new station buildings
which are still in use today. A new footbridge was built across the
station.
The 1960s saw the closure of both the
DN&SR and the LVR due to declining passenger and freight
traffic on both lines. The last passenger train to use the
DN&SR ran in May 1964, a rerouted express train resulting from
a derailment at Reading West. The tracks were lifted in
1967.