Skip to content

[#19]π Mystery Cache

Hidden : 2/12/2026
Difficulty:
3 out of 5
Terrain:
2 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


[About this Series: The Infinite Journey of π]

To most people, π might just be 3.14 in a textbook, or simply the ratio of a circle's circumference to its diameter. But in reality, this infinite, non-repeating decimal is the invisible cornerstone that supports our modern civilization.

Take a closer look around you: the rotation of wheels, the meandering of rivers, the waveforms of mobile signals, and even the roundabouts we navigate every day—π is quietly hidden within these daily details, keeping our world turning.

π is omnipresent. It is an elegant constant in the eyes of mathematicians, a fundamental blueprint in the hands of engineers, and a secret language of nature hidden within circles and cycles.

To celebrate Pi Day 2026 and join the global festivities hosted by Geocaching HQ, I have specially designed this Geocaching series named "π". Each cache in this series represents a unique story of π across different fields.

I hope that while enjoying the fun of the hunt, you will discover that mathematics is far from boring—it is full of surprises. May this series help you gain a new appreciation for the immense contribution of π to mathematics, engineering, and our daily lives.

Happy Pi Day! Let's complete the perfect circle!


Question

 

雪山隧道連結新北市坪林與宜蘭頭城,全長 12.9 公里,是當時世界排名第五長的公路隧道。隧道埋深極深,最大覆土深度達 512.3 公尺(超過台北 101 大樓的高度),配置有東行線、西行線及中間的導坑。雪隧通過極為複雜的地質,包含礫岩、四稜砂岩和許多斷層,其施工難度相當高。

隧道開挖工法一般有TBM全斷面隧道鑽掘機和傳統鑽炸法,TBM需事先訂購特製機器,利用機頭前方巨大的旋轉切削盤(Cutter Head),上面裝滿了滾刀(Disc Cutters),藉由強大的推力將岩石「磨碎」。碎石會通過輸送帶往後運出,同時後方會拼裝預鑄混凝土環片來支撐隧道壁。在地質條件良好下,當時一天可前進25~50m。而鑽炸法就需要人工使用炸藥、十字鎬一點一滴慢慢前進,平均一天5~10m。

西行線最初800m由鑽炸法開鑿後,換TBM上場,然而它遇到了強勁的敵人「四稜砂岩」,硬度高且非常破碎,岩塊間的孔隙充滿了水(屬於背斜層西南翼,雨水極易滲入),TBM的鑽頭一轉動,就有無數的四稜砂岩裂塊掉下來卡住削頭,再加上豐沛的地下水,可謂是施工的惡夢。一年後,TBM只前進不到150m。

1997年12月15日,西行線 TBM 在推進至 38K+902 處時,切穿了巨大的儲水層與剪裂帶。瞬間,高達每秒 750 公升的巨量湧水挾帶土石噴發而出,開挖面瞬間崩塌,倒退了 100 多公尺,超過 7,000 立方公尺的土石瞬間將造價十億的 TBM 當場活埋。

TBM 已經無法挽救,但為了防止災情擴大導致整條隧道坍塌,我們必須立刻在崩塌邊緣架設強力的支撐(鋼支堡)以維持岩壁穩定性,然而,我們必須選擇足夠大的支撐,避免「挫屈」(Buckling)破壞發生。

何謂挫屈?當一根細長的柱子承受極大的「軸向壓力(從兩端往中間壓)」時,在壓力達到某個極限值時,柱子突然無預警地向側邊大幅彎曲並崩塌,這個致命的物理現象就稱為「挫屈」。想像一根直尺立在桌面上,被你用手用力向下壓,在直尺斷裂之前,你會觀察到直尺會先大幅度彎曲,這個現象就稱為挫屈。而判斷構件是否發生挫屈,一般會使用尤拉臨界載重進行計算,當承受軸壓力大於尤拉載重,就會發生挫屈破壞。

請依據尤拉臨界載重,推算鋼支堡的Pcr為何?單位為tf,請四捨五入至小數點後二位。

且依據現場最新監測應力計顯示,最大壓力荷重已達到220tf,假設還未發生降伏破壞,請判斷會不會發生挫屈,如果會,請輸入Y,若不會,請輸入N

最後將兩題答案合併,先輸入數字再輸入英文,數字跟英文間不要有空格。

 

The Hsuehshan Tunnel connects Pinglin in New Taipei City and Toucheng in Yilan. With a total length of 12.9 kilometers, it was the fifth-longest highway tunnel in the world at the time of its construction. The tunnel is buried extremely deep, with a maximum overburden depth reaching 512.3 meters (exceeding the height of the Taipei 101 building). It is configured with an eastbound tunnel, a westbound tunnel, and a central pilot tunnel.

The Hsuehshan Tunnel passes through highly complex geology, including conglomerate, Szeleng sandstone, and numerous fault zones, making its construction exceptionally difficult.

Tunnel excavation methods generally include the Tunnel Boring Machine (TBM) and the traditional Drill and Blast method. A TBM requires custom ordering in advance; it utilizes a massive rotating cutter head at the front, equipped with disc cutters, to "grind" the rock using immense thrust. The crushed rock is transported backward via a conveyor belt, while precast concrete segments are simultaneously assembled at the rear to support the tunnel walls. Under favorable geological conditions, it could advance 25 to 50 meters per day.

Conversely, the Drill and Blast method requires manual labor, using explosives and pickaxes to inch forward bit by bit, averaging only 5 to 10 meters per day.

After the initial 800 meters of the westbound tunnel were excavated using the Drill and Blast method, the TBM took over. However, it encountered a formidable adversary: the "Szeleng sandstone." This rock is highly hard yet extremely fractured, and the pore spaces between the rock fragments were fully saturated with water (located on the southwest wing of an anticline, where rainwater easily infiltrates).

As soon as the TBM's cutter head rotated, countless fractured blocks of Szeleng sandstone would collapse and jam the machinery. Coupled with the abundant groundwater, it was an absolute construction nightmare. After one year of struggle, the TBM had advanced less than 150 meters.

On December 15, 1997, when the westbound TBM advanced to station 38K+902, it cut through a massive aquifer and shear zone. Instantly, a colossal water ingress of up to 750 liters per second erupted, carrying massive amounts of soil and rock. The excavation face collapsed instantly, retreating over 100 meters. More than 7,000 cubic meters of debris buried the billion-dollar TBM alive on the spot.

The TBM was beyond saving. However, to prevent the disaster from escalating and causing the entire tunnel to cave in, we must immediately erect powerful steel rib supports at the edge of the collapse to maintain the stability of the rock walls. Crucially, we must select sufficiently large supports to prevent "buckling" failure.

What is buckling? When a slender column is subjected to an extreme "axial compressive load" (pressed from both ends towards the center), and the pressure reaches a certain critical limit, the column suddenly and without warning bends significantly to the side and collapses. This fatal physical phenomenon is known as "buckling."

Imagine standing a straight plastic ruler on a desk and pressing down on it forcefully with your hand. Before the ruler snaps, you will observe it bending drastically. This phenomenon is called buckling. To determine whether a structural member will buckle, structural engineers generally use the Euler's Critical Load calculation. When the applied axial compressive load exceeds the Euler load, buckling failure will occur.

Based on the Euler's Critical Load formula, calculate the Pcr of the steel rib support in tf. (Round your numerical answer to two decimal places).

Furthermore, according to the latest readings from the on-site stressometers, the maximum compressive load has reached 220 tf. Assuming yield failure has not yet occurred, please determine whether buckling will happen.

• If yes, enter Y

• If no, enter N

Finally, combine your two answers (the number first, followed by the letter) with no spaces in between to form the password for the Geocache checker.

Given Parameters:

• Elastic Modulus (E) = 2040 tf/cm2

• Moment of Inertia for the weak axis (I) = 1600 cm4

• Length of the support (L) = 4 m

• Effective Length Factor (K) = 0.95

You can validate your puzzle solution with certitude.

Additional Hints (No hints available.)

Advertising with Us