The Prestons Pyramid is a 25-metre high dirt pyramid marks the Liverpool interchange of the Westlink M7.
The pyramid is capped in a red peak and is lit up at night by a blue light.
100,000 tonnes of compacted soil collected during construction of the M7 was used to build the pyramid.
When searching for the cache there is no need to climb over the black fence.
*** Congratulations TARDIS 0061 for FTF ***