Dam. It is missing Traditional Cache
-
Difficulty:
-
-
Terrain:
-
Size:
 (small)
Please note Use of geocaching.com services is subject to the terms and conditions
in our disclaimer.
The cache is on the road right of way on a dead end road that once lead to the Balmoral Dam
The Balmoral Dam was built in 1922 to produce power for a feed mill and the village of Muscoda. in 1992 the production of hydroelectricity was stopped. In 2008 flooding damaged the dam which was removed in 2009.
Additional Hints
(Decrypt)
Ab jnyxvat arrqrq, ohg abg gbb rnfl gb trg gb vg rvgure.
Treasures
You'll collect a digital Treasure from one of these collections when you find and log this geocache:

Loading Treasures