Skip to content

Trestle Top: Winston Tunnel Series Traditional Cache

Hidden : 11/27/2016
Difficulty:
3 out of 5
Terrain:
4.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

If you choose to take the short cut to the tunnel and go up the hill.  This is on top of the old trestle.  This is the second in the Winston Tunnel series.

Special thanks to Kirk F and Team Nicholas!

 


The Winston Tunnel is the longest tunnel ever built in Illinois at almost a half mile.  The Sheppard, Winston and Company started construction in 1886 and was completed in 1888 where it was turned over to the Chicago Great Western Railroad. The tunnel maintenance was the chief reason that the CGW was close to bankruptcy and sold out to the Chicago and Northern in 1968 who closed the entire line in 1972. 

The geochache is placed on the Department managed property with permission Permission granted by Jamie Dowdall, Director from the Apple Canyon/Lake Le Aqua-Na State Park. Do not place the following items in the geocache: Food items, inappropriate, offensive or hazardous materials. It is the visitors responsibility to orient themselves with policies and rules pertaining to this Department managed site

Additional Hints (Decrypt)

Vgf ba gbc bs gur uvyy.

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)