Chimney View Traditional Geocache
-
Difficulty:
-
-
Terrain:
-
Size:  (other)
Please note Use of geocaching.com services is subject to the terms and conditions
in our disclaimer.
Peel Power Station was opened on 5 May 1995, by the then Chief Minister Sir Miles Walker CBE MHK. This plant is generally used to provide load management services to the UK and security back-up for the Island. Peel Power Station has a capacity of nearly 40 megawatts.
The cache is hidden at the side of a steep narrow path leading from the road bridge at the Southwest end of West Quay up towards Corrins Folly. & overlooking Peel Power Station. Good footwear is essential as the path can be very slippery. Tweezers maybe necessary & BYOP The cache was placed with the kind permission of Peel Commissioners
Additional Hints
(Decrypt)
Tbefr ntnva