Skip to content

The Long Way: The Winston Tunnel Series Traditional Cache

Hidden : 3/23/2017
Difficulty:
2.5 out of 5
Terrain:
2.5 out of 5

Size: Size:   micro (micro)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:

This is the 7th cache in the Winston Tunnel series.  It is near the starting point if you want to take "the long way" to the Tunnel.  It is about half a mile longer and the terrain is tough but not as tough as going strait up the trestle bank.

Special Thanks to Kirk F 


The Winston Tunnel is the longest tunnel ever built in Illinois at almost a half mile.  The Sheppard, Winston and Company started construction in 1886 and was completed in 1888 where it was turned over to the Chicago Great Western Railroad. The tunnel maintenance was the chief reason that the CGW was close to bankruptcy and sold out to the Chicago and Northern in 1968 who closed the entire line in 1972. 

The geochache is placed on the Department managed property with permission Permission granted by Jamie Dowdall, Director from the Apple Canyon/Lake Le Aqua-Na State Park. Do not place the following items in the geocache: Food items, inappropriate, offensive or hazardous materials. It is the visitors responsibility to orient themselves with policies and rules pertaining to this Department managed site.

Additional Hints (Decrypt)

rlr yriry

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)