The Murchison - Rushworth rail trail is currently not fully complete. Currently the finished section rail trail is a 8-kilometre section from the Murchison Township to the rail bridge at Channel Inlet Road. The rest of the rail trail to Rushworth is set to be completed by March 2024 with funding from the local council.
The railway line started at the Murchison East station was originally constructed to the gold mining town of Rushworth in 1890 and extended to Colbinabbin in 1914 for the transport of grain. Rushworth became a junction when a line was constructed to Girgarre in 1917. A diversion of the line was necessary when the Waranga Basin was constructed. The lines were all closed by 1987.
You are looking for a small sized cache and has room for some small swaps.
**Congratulations to Wearegleesos for FTF**
Watch out for creepy crawlies and wriggly sticks.
Please BYO pen