Skip to content

Mosty - Bridges Multi-cache

This cache has been archived.

Limak: Odstehoval jsem se a kešku nemohu, bohužel, kontrolovat.

More
Hidden : 9/12/2004
Difficulty:
3 out of 5
Terrain:
2 out of 5

Size: Size:   regular (regular)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


Team LIMAK pro vas pripravil svou prvni mutlicache. Prima vzdalenost mezi body je asi 8 km.

Team LIMAK prepared for you your first multi-cache. Direct distance over stages is approx 8 km.

 

 

Namest nad Oslavou

- prvni pripominka r. 1234, jako osada pod hradem pri brodu pres reku Oslavu, v 16. století povysena na mestecko, od r. 1886 mesto. Pod zamkem kamenny most Z r. 1737 zdobený sochami ("moravsky Karluv most").

- as a settlement spreading under the castle by a ford crossing the river Oslava mentioned for the first time in 1234, in the 16-th century advanced to a small town and finally announced a town in 1886. Under the castle there is a stone bridge decorated sculptures ("Moravian Charles Bridge").


Vodni nadrz Dalesice (water reservoir)

- vodni dilo na rece Jihlave postavene v letech 1971-78. Ma nejvyssi sypanou hraz v CR o vysce 99,5 m s precerpavaci elektrarnou se ctyrmi francisovymi turbinami. Prehradni jezero o plose 480 ha slouzi jako zdroj chladici vody pro jadernou elektrárnu Dukovany a k castecnemu zachyceni povodnovych vln. Rekreace a sportovni rybatstvi zejmena v okoli Hartvikovic. Pri precerpavani dochazi k velkemu kolisani hladiny.

- built on the river Jiblava in 1971-78. The highest piled dike in the CR 99.5 m with a pumping power plant with four Francis' turbines. The water reservoir of a total area 480 ha serves as a source of cooling water for a nuclear power plant Dukovany and catches flood water to a certain level.
Recreation resort and sports angling centre mainly in Hartvikovice surroundings. During pumping a water level varies a lot.


Start
Pocet kamennych soch na moste je cislo A.
Count stone sculptures on the bridge and that is A.

N1=N-78*A-11
E1=E-228*A-12


Stage 1
Nalezene cislo je císlo B.
Number, that is B.

N2=N1-B+615
E2=E1+B-1968


Stage 2
Cedulka se dvema trojcislimi. První trojcisli minus druhe trojcisli je cislo C.
Docket With two ternarys of the numbers. First ternary minus second ternary that is C.

N3=N2-C-205
E3=E2+9

 

Stage 3
Pocet pismen v krestnim jmene hostinskeho je cislo D.
Count characters in landlords first name that is D.

N4=N3+14*D
E4=E3+110*D+3


Stage 4
Find cache.

Additional Hints (Decrypt)

xnzra fgbar

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)