Skip to content

Cache Me At The Knob Traditional Geocache

This cache has been archived.

NCreviewer: It appears that the CO intended to archive this listing. If I am mistaken please contact me through my profile with the GC# of the cache in question.

More
Hidden : 10/20/2019
Difficulty:
2 out of 5
Terrain:
2 out of 5

Size: Size:   regular (regular)

Join now to view geocache location details. It's free!

Watch

How Geocaching Works

Please note Use of geocaching.com services is subject to the terms and conditions in our disclaimer.

Geocache Description:


Howard Knob was named after Benjamin Howard, a British loyalist, contemporary of Daniel Boone, and early settler of the area. According to local legend, Howard hid from Whigs on the knoll which was to be named after him.
In 1977, the Federal Energy Research and Development Administration and the Department of Energy announced that Howard Knob had been selected as the site for an experimental wind turbine, which was later built in October 1978. The project was part of a surge in renewable energy research which began under then-President Jimmy Carter. The turbine, formally known as MOD-1, was managed by NASA and operated by a local electric company. It stood 131 feet (40 m) tall and had two 97-foot (30 m) long steel blades that rotated counterclockwise at 35 miles per hour (56 km/h). It was designed to power 300 to 500 average-sized homes, given wind speeds of 25 miles per hour (40 km/h).
An unintended consequence of the new technology was a low-frequency "swish-swish" or "wooshing" noise that irritated locals. In March and April 1980, DOE and NASA engineers determined that a two-cycle-per-second sound was generated by wind blowing through the blades. Although the sound was twenty cycles below the range of human hearing, it caused windows and other objects to vibrate audibly. A group of Appalachian State University students calling themselves "Wooshies" mocked the turbine project in a class video and gained the attention of local and regional newspapers. The turbine was also blamed for disrupting television signals. Some questioned whether it was working at all, since the blades did not seem to move very often. The turbine was dismantled in 1983.
The abandoned turbine site on Howard Knob was handed over to the county to serve as a park "in perpetuity."
Howard Knob has been at times a popular spot for bouldering, rock climbing, and hang gliding. However, those activities were discouraged and ultimately prohibited by town authorities and private property owners.

Additional Hints (Decrypt)

Ubjneq Xabo Ryringvba: 4, _ _ _ sg

Decryption Key

A|B|C|D|E|F|G|H|I|J|K|L|M
-------------------------
N|O|P|Q|R|S|T|U|V|W|X|Y|Z

(letter above equals below, and vice versa)